AI Project Controls Platform

Control the project
before the delay
controls you.

Controlynx.ai automates daily reports, delay analysis, planned vs actual tracking, and executive dashboards — so your project controls team spends less time formatting and more time controlling outcomes.

Built for construction workflows Works with Excel & Primavera data Human review before submission

Designed around construction industry workflows

Primavera P6
Excel Reporting
PowerPoint Export
PDF Generation
Word Documents
MS Project
The Problem

Manual project controls
is costing you control.

Every construction project runs on the same broken reporting loop. Your best engineers spend their time on admin instead of analysis.

01

Reports take hours to produce

Planning engineers spend Monday mornings chasing data from site teams instead of reviewing the schedule. A report that should take 30 minutes takes half a day.

"I'll send the DPR by 3pm — still waiting on data from site."

02

Delays surface too late

By the time a delay is visible in a monthly report, the project has already lost two weeks. Early warning signals are buried in spreadsheets nobody has time to read.

"We only found out about the concrete delay when the client asked."

03

Data lives in silos

Progress data, manpower logs, procurement status, and engineering approvals all sit in separate Excel files, WhatsApp threads, and email chains. Nobody has the full picture.

"The MEP progress figures in the weekly report don't match what the subcontractor submitted."

04

Management lacks real-time visibility

Directors and PMOs receive weekly snapshots at best. They make decisions on data that is already five days old, and can't act on project health issues until it's too late to recover.

"By the time the monthly report reaches me, the problem is already a contract issue."

The Solution

From site data to executive report.
In minutes, not days.

Controlynx.ai collects, structures, and transforms your project data into professional reports and dashboards — automatically.

1

Site teams submit progress in 5 minutes

A structured mobile form replaces WhatsApp updates, phone calls, and informal logs. Activities, manpower, photos, issues — collected once, used everywhere.

2

AI compares planned vs actual

Controlynx reads your baseline schedule, compares it against reported actuals, calculates variances, and identifies activities at risk — automatically.

3

Reports and dashboards are generated

Daily progress reports, weekly summaries, monthly executive reports, and PowerPoint presentations — all generated with your project data, formatted to professional standards.

4

Your engineer reviews, approves, and sends

The human review step is built in. Your planning engineer reviews the AI-generated output, makes any adjustments, and submits — with confidence, not frustration.

Report generation queueToday — Week 22
Daily Progress ReportTue 30 May — Auto-generated
READY
Weekly Progress ReportWeek 22 — Generating…
GENERATING
Monthly Executive ReportMay 2026 — Awaiting review
REVIEW
AI Summary — Week 22

"Structural works are progressing at 78% against a planned 81%. A 3-day delay on concrete pours at Level 14 is the primary critical path risk. Recommend immediate review of pour schedule for Levels 15–17."

Platform Features

Every tool your project controls
team actually needs.

Ten focused capabilities that eliminate the most time-consuming manual tasks in construction project controls.

Daily

Daily Report Automation

Generates complete Daily Progress Reports from site team inputs. Formatted, structured, and client-ready before your engineer finishes their morning coffee.

Weekly

Weekly Report Automation

Aggregates 7 days of daily data into a structured weekly progress report — including S-curve, planned vs actual, issues log, and 2-week lookahead.

Monthly

Monthly Executive Reports

Produces the full executive monthly report — narrative, KPIs, schedule variance, cost update, and forecast — in minutes instead of three days.

Analysis

AI Delay Analysis

Compares planned vs actual progress across all activities, calculates schedule variance, identifies critical path risks, and flags early warning signals before they become claims.

Tracking

Engineering & Procurement Logs

Tracks engineering submittals, approvals, and RFIs alongside procurement delivery schedules. Surfaces blockers before they impact the construction programme.

Resources

Resource Planned vs Actual

Compares manpower deployed against plan by trade, discipline, and area. Highlights resource gaps and productivity trends over time.

Dashboard

Progress Dashboard

A live project health view showing overall progress, area-by-area breakdown, schedule performance index, and current programme status at a glance.

Risk

Risk & Early Warning Alerts

Automated alerts when activities fall behind critical path thresholds, procurement delivery windows are missed, or resource deployment drops below plan.

Product Preview

The AI command center for
construction project controls.

A single dashboard that gives every stakeholder — from site engineer to PMO director — exactly the visibility they need.

Controlynx.ai Dashboard — Al Noor Tower, Package 3B
Live
⚠ 2 Risk Alerts
Project Health Score
74
/100 — Attention required
Schedule Performance0.94 SPI
Cost Performance1.03 CPI
Resource Efficiency88%
Planned vs Actual — Week 22
W17W18W19W20W21W22
Active Risk Alerts
Concrete pour delay — Level 14
Critical path · +3 days · SV: −AED 84K
Rebar delivery at risk
High priority · ETA: 4 Jun · Float: 2d
MEP rough-in productivity -12%
Medium · Trending below plan
Progress by Area
Structural Works78%
MEP Installation54%
Finishes31%
External Works90%
Engineering & Procurement
RFIs Open14
Submittals Pending7
Deliveries On Time92%
Manpower On Site143
Generate Reports
Daily Progress Report
Ready to generate
Weekly Progress Report
Week 22 — Generating
Monthly Executive Report
May 2026 — Ready
How It Works

Four steps from raw data
to actionable intelligence.

1

Upload or connect project data

Import your baseline schedule, activity list, and project structure. Works with Primavera exports, MS Project files, and Excel-based schedules.

2

AI structures and validates

Controlynx reads incoming site progress, cross-references your baseline, validates data quality, and calculates variances across all activities.

3

Dashboards and reports generated

Professional reports are produced instantly — DPR, weekly, monthly, delay analysis, resource report, and PowerPoint presentation — formatted to industry standard.

4

Teams act on risks earlier

Risk alerts, early warning indicators, and variance flags give project controls teams the time to intervene before delays become disputes.

Use Cases

Built for every role in
your project controls team.

From the planning engineer on site to the PMO director reviewing the portfolio — everyone gets what they need.

PCMProject Controls Manager

A real-time view across the entire project

Spend less time compiling status updates and more time identifying risks. Controlynx gives you a live project health score, variance analysis, and automated risk alerts.

  • Live project health score and SPI/CPI tracking
  • Automated variance detection across all activities
  • One-click report generation for client submission
PEPlanning Engineer

Stop formatting. Start analysing.

Your expertise is in the schedule — not in copy-pasting site data into Word templates. Controlynx handles the formatting so you can focus on programme control and delay prevention.

  • Automated daily, weekly, and monthly reports
  • Planned vs actual comparison built in
  • More time for critical path analysis
PMProject Manager

Accurate reports, delivered on time, every time.

Get complete, consistent project status reports without chasing your team. Controlynx ensures the client receives professional documentation regardless of how busy the project gets.

  • No more chasing the team for Monday reports
  • Client-ready formatting as standard
  • Audit trail of all submitted progress data
SMSite Manager

Five minutes to submit. Nothing else required.

A simple, structured daily form on any phone. Activities, manpower, photos, and issues — submitted in under 5 minutes. Controlynx handles everything else automatically.

  • 5-minute structured daily site submission
  • Works on any phone, no app required
  • Photo attachments included automatically
CMCommercial Manager

Data to support every variation and claim.

Cost performance, productivity tracking, and earned value analysis built in. Controlynx produces the documentation trail your commercial team needs to manage variations proactively.

  • Cost and productivity dashboards
  • Earned value and CPI tracking
  • Exportable data for commercial submissions
DIRDirector / PMO

Portfolio visibility without the Monday morning chase.

Consistent reporting across all projects, without chasing project teams. Controlynx delivers standardised health scores, risk summaries, and executive dashboards for every project you oversee.

  • Standardised reporting across all projects
  • Executive health scores and risk summaries
  • No more inconsistent formats from different teams
Report Library

Every report your project
needs, automated.

Ten report types covering the full project controls lifecycle — from daily site updates to executive board presentations.

Daily Progress Report
Site activities, manpower, issues, weather, and photo attachments — auto-generated every day.
Daily
Weekly Progress Report
S-curve, planned vs actual, lookahead schedule, issues log, and manpower summary.
Weekly
Monthly Progress Report
Full executive narrative, KPIs, variance analysis, cost update, and next-month forecast.
Monthly
Executive Dashboard
PowerPoint presentation with charts, metrics, photos, and key messages for client meetings.
On Demand
Delay Analysis Report
Critical path analysis, schedule variance, impacted activities, and delay causation summary.
On Demand
Resource Report
Planned vs actual manpower by trade, area, and discipline with productivity trend analysis.
Weekly
Engineering Log
Submittals, RFIs, approvals, and drawing revisions tracked and reported in structured format.
Weekly
Procurement Log
Material delivery status, lead time tracking, and procurement risk flags against programme dates.
Weekly
Measurable Outcomes

What project controls teams
get back with Controlynx

8+
Hours saved per engineer per week

Time previously spent formatting reports, chasing data, and updating templates — returned to programme analysis and schedule control.

−40%
Reduction in reporting preparation time

Across daily, weekly, and monthly reports combined. Engineers generate the same output in a fraction of the time.

72h
Earlier delay detection

Automated variance analysis flags critical path risks up to three days before they would appear in a manually prepared report.

100%
Consistent reporting format

Every project, every report, every submission — same professional standard. No more inconsistent formats from different teams or sub-consultants.

Why Teams Trust Controlynx

Designed for construction.
Built for compliance.

Built for construction project controls logic

Every feature is designed around actual project controls workflows — not generic project management. The platform understands S-curves, earned value, critical path, and float.

Secure project data handling

Your project data is never shared or used to train external models. All data handling follows enterprise security standards with full audit trails for every submission.

Human review before every submission

Controlynx does not submit reports without your engineer's review. Every AI-generated output goes through a structured review step. The human stays in control.

Works with your existing Excel workflows

No need to replace your current tools. Controlynx accepts Excel-based schedule data, P6 exports, and standard reporting templates — and outputs to PDF, Word, and PowerPoint.

Supports Primavera-style planning data

Import baseline schedules from Primavera P6, MS Project, or Excel. Controlynx understands WBS hierarchies, activity codes, and planning logic — no manual reformatting required.

Consistent with industry reporting standards

Report formats are aligned with FIDIC, NEC, and GCC construction contract requirements. Client-ready output that meets the documentation standards your contracts demand.

Pricing

Simple, transparent pricing
for every team size.

All plans include a 14-day free trial. No credit card required to start.

Starter
Individual

For planning engineers managing a single project who need to eliminate manual reporting overhead.

$99/month

1 project · 5 users · Monthly or annual

Start Free Trial
  • Daily, weekly, monthly reports
  • Planned vs actual tracking
  • PDF and Word export
  • 1 active project · Up to 5 users
Enterprise
Portfolio

For contractors, PMOs, and consultancies managing multiple simultaneous projects who need portfolio-level visibility and standardised reporting.

Custom pricing

Unlimited projects · Unlimited users

Contact Sales
  • Everything in Professional
  • Portfolio-level dashboard
  • Custom report templates + SSO
  • Dedicated onboarding + support

14-day free trial on all plans · No credit card required · Cancel anytime

FAQ

Common questions from
project controls professionals.

No. Controlynx.ai is a tool for project controls professionals, not a replacement for them. The platform handles the mechanical, time-consuming parts of the job — data collection, formatting, and report generation — so that engineers can focus on analysis, programme control, and risk management. Human review is built into every report before submission.
Yes. Controlynx.ai is designed to work alongside your current processes. You can import schedule data from Excel, P6 exports, or MS Project files. Outputs are available as Excel, PDF, Word, and PowerPoint — so your team can work with them in existing tools without friction.
Yes. Controlynx.ai accepts Primavera P6 XER exports, activity lists, baseline schedules, and WBS hierarchies. The Professional plan includes full P6 integration — upload your XER once and all activities populate your DPR cascading dropdowns automatically.
Yes. The core reporting modules cover Daily Progress Reports, Weekly Progress Reports, and Monthly Executive Reports. Additional outputs include delay analysis, resource reports, engineering logs, procurement logs, cost reports, and PowerPoint presentations — all generated from the same project data.
Your project data belongs to you. It is never used to train external AI models, shared with third parties, or used outside the scope of your account. All data is handled with enterprise-grade security standards. For enterprise clients, dedicated data residency and enhanced security arrangements are available.
Yes. Controlynx.ai was built by a construction professional with 22 years of experience in GCC construction markets. Report formats, contract terminology, and workflow assumptions reflect GCC construction industry standards — FIDIC, NEC, and local contract forms are all supported.
Start Today

Control the project
before the delay
controls you.

Start your 14-day free trial and see how Controlynx.ai transforms your project controls workflow — from site data to executive reports, in minutes. No credit card required.

14-day free trial · No credit card required · Cancel anytime